Ready for Prime Time

Ready for Prime Time

Ready for Prime TimeThe five original 1866 windows on the porch are in the process of restoration. The window sashes that hung lopsided in the frames were carefully removed and about 8 layers of paint, caulk and over-glaze were stripped away.

Two wonderful volunteers, Frank and David have been helping with this very painstaking slow but very, very important restoration!

The frames are ready to be primed and painted. When complete, we will paint the porch walls, touch-up the ceiling and sand the floors. Our goal is to have the interior of the porch complete by April.